Super User

Super User

Install pipe through industrial roof and fit flashin. Cut out the plastic coated steel cladding and install pipe on factory roof. 

Sunday, 25 September 2016 12:57

fit new lead valley

remove and replace a split lead valley. new code 4 lead is uesd on all new lead valleys. 

Sunday, 25 September 2016 12:54

blocked gutter outlet cleared

call out and unblock a gutter outlet in dukinfield tameside

Sunday, 25 September 2016 12:50

new chimney gas pots

Remove damaged loose pots and replace with new clay gas pots 

The office / Factory roof roof had leaks in lots off areas. we fitted new steel flashings and repaird the cracks in the flat roof.